Upwing Well Trials

Upwing’s Subsurface Compressor System™ (SCS) has been proven in multiple trials in both wet and dry gas wells in the Anadarko basin.

Trial 1

The first trial took place in January of 2016. SCS’s technical parameters were within the range predicted by Upwing’s proprietary analytical programs. The compressor system operated at 45,000 RPM, increasing flow by 16%.

Trials 2 and 3

The second trial took place in November of 2016, and the SCS was deployed in only 3 hours. The compressor’s performance exceeded design expectations by 25%. The system operated continuously for weeks, was inspected and deployed in a third well with rich gas.

Trials 2 and 3

The second trial took place in November of 2016, and the SCS was deployed in only 3 hours. The compressor’s performance exceeded design expectations by 50%. The system operated continuously for weeks, was inspected and deployed in a third well with rich gas.